Day: March 12, 2022

1. SCOPE OF FUNCTION The work specified in the contract will certainly include. 1. Supply, mount as well as appoint a burner as given in the technical specs 2. Stipulation for adherence to OSHA as well as other statutory requirement relating to Health and Safety of employees during implementation of the works covered in this […]
incinerator Medical Waste Incinerators ⋅ 202026 Antisipasi TPA Tlekung Overload, Terus Tambah TPS 3R Jawa Pos Radar Malang (Sindiran) (Siaran Pers) (Blog) Tempat pembuangan sampah ini pun hanya tinggal menunggu incinerator atau alat pembakar sampah dengan suhu tertentu sehingga bisa … | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification) Newsletter。 […]
1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as well as 170% -120% of stoichiometric amount specifically. Circulation meter/suitable circulation measurement tool shall be supplied on the key and second air ducting. The combustion air shall be provided via […]