One chamber incinerator

One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

Newsletter – waste incinerator

waste incinerator ⋅ 2020726 Fortnum Carlisle Ltd applies for environmental permit for Carlisle waste incinerator GOV.UK The Environment Agency is holding a public consultation on an application for an environmental permit to operate a waste incinerator near Kingmoor … More trash probably won’t be a money maker for […]

Newsletter – incinerator

incinerator Medical Waste Incinerators ⋅ 2020726 Equipo incinerador Markt: Neueste umfassende Forschung 2020 mit COVID-19-Wirkungsanalyse … StrandGazetteDe … herunter, um die Struktur des vollstandigen Berichts zu verstehen:https://marketresearch.biz/report/incinerator-equipment-market/request-sample. | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification) Newsletter。 |

hiclover burner 100-150kgs per hour

Version YD-100 Photo Burning Price 100-150 kgs/hour Trick Burning Chamber 2000 Liters Secondly Combustion Chamber 500 Liters Feed Establishing Handbook Voltage 220V/380V Power 2.5 Kw Gas Kind Diesel Oil Heating Unit Italy Original Oil Intake (Diesel Oil) Average 28 kg/hour Gas Use (Gas) *** Inner Measurements 180x115x98 centimeters (key chamber) […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020726 A nivel mundial Sistemas de eliminaciÃn de residuos mÃdicos Mercado con anÃlisis de impacto … El Informativo Inmobiliario KG, Veolia Environnement S.A., Clean Harbors, Inc., BioMedical Waste … Inc., Sharp Compliance, Inc., Waste Management, Inc., Republic Services, … | Auto. Control […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020726 Higgens: Medical facility on Four Mile Journal Times … not in a residential area that will not appreciate parking lot lights and the beeping of trucks bringing supplies, handling medical waste and garbage. The Fascinating Rise of Sun Pacific Holding Corp […]

Biomedical Waste Heater, 10-15 KG.

The first is a little Shall provide ladder till the top. It shall be operated by manual and automatic mode. Combustion Fan: Material of construction of outer body: Mild Steel refractory lined from interior. Second is a 500kg per/hr incinerator for a company planning to begin a I.D. Fan: It shall have separate digital display of temperature for both chambers. C.E.= __%CO2______ x 100 Material of Construction: Mild Steel, 5mm thick Bidder shall submit detail drawings, design, and layout plan of civil functions. Volatile organic compounds in ash shall not be more than 0.01%. Progress, in detail. Secondary chamber gas residence time shall be minimum 1 second at 1050 oC. Brand: Chimney of 30 meters Height: Refractory: 75mm thick castable.{ (adsbygoogle = window.adsbygoogle || []).push({});|} Standards and Safety Requirements Must provide user training (like how to use and maintain the equipment). Operational Requirements Re- Circulation Pump for Venturi Scrubber Substance: Refractory bricks confirming to international standard. Material of Construction: Mild steel. port. Corrective/breakdown maintenance whenever required. It shall have to reduce flue gas temperature prior to […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020726 Global Dewatering Squeezer Market 2020- Impact of COVID-19, Future Growth Analysis and … Bandera County Courier Organic Food Waste Pulp Paper Waste Medical Waste Slaughterhouse Waste Domestic Waste. Global Dewatering Squeezer Market Segmentation By … Ready-to-eat Foods Market Development Strategy 2020-2024 | […]

Heaters that can take care of Bio-Medical waste red bag

heating units which could look after Bio-Medical waste (red bag) from laboratory with level 2 in improvement to 3, family pet research study, as well as health. Site 1– – – – 4,650 Kgs routine month-to-month (I’ve suggest that I set up two heaters at this area offered that it […]

Newsletter – incinerator

incinerator Medical Waste Incinerators ⋅ 2020726 Warren County seeks public comment on waste plan Glens Falls Post-Star Braymer said the regional trash incinerator in Hudson Falls does not have much life left in it, so the county needs a different approach to waste … | Auto. Control Waste […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020726 Machines to sanitise Telangana hospitals The New Indian Express “Hospitals with COVID- 19 patients are likely to have the virus in their biomedical waste, so it is better to use machines to move waste,” he said. State of the art machinery […]

islands incinerators

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately   Autoclave or microwaves  separately   temperature monitor  attached outside of machine operating  Fuel and electric   –          Toxic and dangerous wastes,   –          Medical pharmaceutical and hospitable liquids  Wastes –          Domestic garbage   –          Electric and electronic wastes –          Industrial wastes –          In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before 4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai 5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item 6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog 7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china) 8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers. 9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines 10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products,  you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.    If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.  

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020726 Household hazardous waste collection is Saturday West of the I The Kenosha County Household Hazardous Waste Collection Program … medical and pharmaceutical waste and commercial or business waste. Incinerator Market will profits to Cross USD 11970 million in 2020 to 2025 […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020725 Panipat Red Cross society, ESI hospital among 7 to get notices over biomedical waste disposal Times of India It is alleged that these healthcare centres and the blood bank have not made any arrangements for disposal of biomedical waste generated in their … […]

500kg/day thaw ability heater

2 dishwashers 1 with 500kg/day shed capacity an extra one with 1000kg/day thaw capacity 1 x Electrode 1 x Gas Filter 1 x Photocell 1 x Versatile pipeline 1 x Nozzle 1 x Control Box

Newsletter – incinerator

incinerator Medical Waste Incinerators ⋅ 2020725 Protesters March Against Endicott Battery Recycling Facility Spectrum News “This incinerator, lithium incinerator is being touted as a job creator, which in fact it’s not, it’s a job destroyer, and it’s a community destroyer as well,” … | Auto. Control Waste Incinerator […]

eco satisfying burner

(adsbygoogle = window.adsbygoogle || []).push({}); 50 bed healthcare center in addition to additionally would love to have your referral for heater that can properly take care of the lots of 50 bed hospital.Incinerator for burnable rubbish (paper & & & & & & & & all-natural) gadget capacity (100/150 lts). […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020725 Chennai Woman Accuses ABVP President Dr Subbiah Shanmugam of Harassment, Urinating at … LatestLY The 62-year-old woman, a widow, has accused him of urinating and throwing medical waste at her doorstep amid a row between them over parking lot … | […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020725 Sanitation Workers: Prejudices and pandemic Rising Kashmir Daily English Newspaper They are the frontline workers after the health care professionals. … Unlike other frontline warriors like healthcare workers, journalists, waste workers … | Auto. Control Waste Incinerator & Auto. Roll Air […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020725 Healthcare Satellite Connectivity Market Drivers, Trends, Opportunities and Forecast 2026 … Weekly Wall Previous Previous post: Medical Waste Management Market by Companies, Regions, Type and Application 2026|Stericycle, Sharps Compliance … | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification) […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2020725 Medical Waste Management Market Status by Upcoming Trends 2020 Growth Drivers … Market Research Posts Other key details include volume, installed capacity, value chain. Medical Waste Management Market Dynamics: –. Drivers: (Developing regions and … Medical Waste Disposal Market Growth by Forecast […]

islands incinerators

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately   Autoclave or microwaves  separately   temperature monitor  attached outside of machine operating  Fuel and electric   –          Toxic and dangerous wastes,   –          Medical pharmaceutical and hospitable liquids  Wastes –          Domestic garbage   –          Electric and electronic wastes –          Industrial wastes –          In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before 4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai 5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item 6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog 7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china) 8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers. 9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines 10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products,  you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.    If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.